33 C
Mumbai
Sunday, April 18, 2021
Home NEWS MUDA to focus on drinking water, group housing, layout development projects

MUDA to focus on drinking water, group housing, layout development projects

The Mysuru Urban Development Authority (MUDA) proposes a complete drinking water challenge to cater to the longer term necessities of the town, take up group housing and joint development of residential layouts with landowners, and kickstart the Peripheral Ring Road development with the involvement of RITES.

These are a few of the salient projects introduced within the MUDA price range for 2021-22 which envisages an revenue of ₹1,468.85 crore and an expenditure of ₹1,083.11 crore, leaving it with a surplus of ₹385.74 crore.

The MUDA price range was offered by Commissioner D.B. Natesh right here on Saturday. The drinking water challenge is anticipated to cater to the necessities of R.T.Nagar, Vijayanagar 4th stage and personal layouts surrounding it, Devanur third stage and surrounding areas, Ambedkar Nagar A and B block, Sathgalli 2nd stage and surrounding areas, Vasanth Nagar, Lal Bahadur Shastri Nagar, Shanthaveri Gopalgowda Nagar and surrounding areas.

The new schemes can be taken up by the Karnataka Urban Water Supply and Drainage Board and can meet the necessities of the projected inhabitants for the subsequent 30 years. The MUDA has earmarked ₹25 crore for the Haleunduwadi drinking water scheme to be taken up by the KUWSDB and ₹30 crore to shore up the capability of the Bidargudu-Kabini drinking water scheme.

While the group housing and joint development of residential layouts is an idea that has been introduced up to now, the PRR will get an official stamp with the allocation of ₹100 lakh in direction of the preparation of a feasibility report and a DPR by RITES.

The MUDA proposes to assemble high-rise flats at Vijayanagar 4th stage, Dattagalli 2nd stage and Gokulam third stage. In all, 1,144 housing items will come up in these flats at a value of ₹372.36 crore towards which the allocation is ₹100 crore for the monetary yr 2021-22.

The MUDA will even take up a housing scheme for the advantage of migrant staff employed within the industrial areas of Mysuru and who stay in non permanent sheds. The proposal is to assemble housing items of 350 sq ft to 500 sq ft with the involvement and contribution of the Department of Labour, and MUDA has earmarked ₹5 crore for it.

The joint development of residential areas in partnership with the landowners is a thought which is floating since virtually a decade however the price range has earmarked ₹15 crore for it. MUDA has obtained approval for joint development of plots from the landowners in Udbur-Daripura, Bommenahalli, Devagalli-Mulluru and Vajamangala. The allocation is ₹50 crore.

The MUDA has obtained clearance for joint development of plots on a swathe of 145 acres of land at Udbur-Daripura for the development of two,500 plots, 160 acres in Bommenhalli the place 2,800 plots could be developed, 78 acres in Devgalli-Mulluru the place 1400 plots could be developed and 132 acres in Vajamangala the place 2,376 plots could be developed.

Mr. Natesh mentioned the PPR for Mysuru was included within the Mysuru Master Plan 2031 and entails a size of 87.17 km and can facilitate the expansion of Mysuru and would cater to its long-term necessities. Besides this, 14 essential roads within the metropolis can be developed at a value of ₹24 crore.

The price range plans to revive and restore a few of the water our bodies in and round Mysuru and it consists of Bogadi lake, Devanur lake, Kergalli lake, Ayyajayyanahundi lake, Balahalli lake and Sathalli lake on survey quantity 106. This is as well as to different minor water our bodies within the area and the MUDA has earmarked ₹4 crore for the aim within the new monetary yr towards the projected expenditure of ₹12.74 crore.

Source link

Most Popular

EnglishGujaratiHindiMarathiUrdu